Services
Driveway and patio cleaning
Block paving, concrete and sandstone pressure-washed with a rotary cleaner, re-sanded and treated so it stays clean longer.

Semi drives from £140, patios from £90
A pressure washer in the wrong hands strips the joints out of block paving and etches lines into sandstone. A rotary surface cleaner, with the pressure turned down for soft stone, does the same job evenly and without the stripes.
We sweep, then wash with a rotary surface cleaner that keeps the jet at a fixed height and spins it in a hood, so the surface comes up evenly and the spray stays off your car and the windows. Edges and steps get a hand lance.
Block paving is then left to dry and re-sanded with kiln-dried sand brushed into the joints, which locks the blocks and keeps the weeds out. Patios and drives both get a biocide wash afterwards to slow the green coming back.
Sandstone and Indian stone patios are washed at low pressure. Black spots on sandstone are lichen and need a separate treatment over a few weeks; we say so rather than blast them.
What is included
- A rotary surface cleaner, no stripes
- Edges, steps and kerbs by hand
- Block paving re-sanded with kiln-dried sand
- A biocide wash to slow regrowth
- Run-off swept to the drain, not the road
The best month
- Best March to October. March to October, so the joints dry enough to be re-sanded the same week.
What it costs
Driveways from £70 on a terrace front to £220 detached; patios £90 to £160; kiln-dried sand and a biocide included. The prices page works it out for your house type and storeys, with any extras.
Questions about driveways and patios
Do you need my water?
Yes, from an outside tap. If you do not have one, we bring a tank, which adds £20.
Can you get oil stains out?
Fresh ones mostly; old ones fade. We use a degreaser on the stain first and tell you what to expect.
When can I park on it?
Straight away on concrete and tarmac. On block paving, wait until the evening so the new sand settles.
Choose your house, see the price, pick the month.
Gutters any time; drives, render and roofs when the weather lets the job work. Photographs of every gutter run come by text the same day.