Prices

Per square metre. Base, drains and skips in it.

Guide prices for a full build with normal access. The exact figure comes from the measure, and once quoted it only moves if we hit rock or a buried tank, which we photograph and ring you about the day it happens.

Guide prices

The three drives most people ask about.

Block paving

Herringbone with a contrasting border

£95 per m²

  • 150 mm sub-base, edge restraints, kiln-dried sand
  • Typical 50 m² drive £4,800 to £6,500
  • Channel or soakaway included
  • Ten-year guarantee
Book a measure

Resin bound

Seamless, permeable, UV-stable

£110 per m²

  • New tarmac base included
  • From £68 per m² over sound existing concrete
  • No soakaway or planning needed
  • Ten-year guarantee
Book a measure

Tarmac

Two-layer hot tarmac, sett edging

£70 per m²

  • Full sub-base, not an overlay
  • Typical 50 m² drive £3,500 to £4,200
  • Driven on the next day
  • Ten-year guarantee
Book a measure

Everything else

The full list.

Full builds with normal access. Steep drives, hand-dig-only access, rock, and drives over 100 square metres are priced at the measure; small jobs under 20 square metres carry a minimum charge because the digger and the skip cost the same.

Guide prices including excavation, sub-base, edging, drainage, waste removal and VAT. Updated October 2026.
JobPriceNotes
Measured survey and drawingFreeDrainage shown, planning position confirmed.
Block pavingfrom £95 per m²60 mm blocks +£6, 80 mm +£12, clay +£35, permeable +£18 per m².
Resin bound, new basefrom £110 per m²Over sound existing concrete or tarmac from £68 per m².
Tarmacfrom £70 per m²Overlay of sound tarmac from £32 per m². Red or golden chip +£14.
Patio, porcelain or sandstonefrom £120 per m²Porcelain about 20% more than sandstone. Circles and borders quoted.
Steps and retaining wallsfrom £480Per flight or per 3 metres of wall to 600 mm.
Linear channel and soakawayfrom £480Included in a new drive; this is the price on its own.
Dropped kerbfrom £1,400Council application, build and inspection included.
Edging and kerbsfrom £28 per mConcrete, granite sett or sleeper, haunched.
Clean, re-sand and sealfrom £6 per m²Typical 50 m² drive £300 to £400. Resin jointing from £12 per m².
Repairsfrom £180Sunken areas, loose edges, broken blocks. Same ten-year guarantee.
Minimum charge£1,900For new builds under 20 m². Cleaning and repairs excepted.

Nothing added at the end

Excavation, sub-base, edging, drainage, skips and VAT are in the figure. Rock or a buried tank is photographed and priced before we continue.

Ten years in writing

Sinking, rutting, cracking and loose edges, insurance-backed, on the invoice. Transfers to the next owner.

Base photographed

You get a photograph of the compacted sub-base before it is covered. The cheaper quote usually cannot send you one.

Paid in two stages

Nothing up front. Half when the sub-base is in and photographed, the balance when the drive is finished and swept.

Want the real figure for your drive?

Book the free measure. The drawing and the price per square metre follow within two days.