The wind comes off the Bristol Channel without much in the way. A fence here is built for that or it is built twice.

Posts are concreted 600 mm into the ground, or bolted to concrete godfathers where the ground is rock, at 1.8 metre centres with a gravel board at the bottom so the timber never touches soil. Closeboard is the strongest and the best value; slatted cedar or thermowood screens are the ones in the photographs; composite boards never need painting. We take the old fence away.

Decks are built on a treated timber frame on concrete pads with the boards on joists at 400 mm centres, which is why ours do not bounce. Composite boards for low maintenance, hardwood or treated softwood for budget. Pergolas, raised beds, bin stores and bike sheds are built to the same standard from the same timber.

What is included

  • Posts concreted 600 mm deep, gravel boards throughout
  • Closeboard, slatted cedar, thermowood or composite
  • Old fence removed and taken away
  • Decks on a treated frame at 400 mm joist centres
  • Pergolas, raised beds, bin and bike stores
  • Five-year guarantee on fencing and decking

What it costs

Closeboard fencing from £95 per metre, slatted cedar from £160 per metre, including concreted posts and removal of the old fence. Composite decks from £2,800 for 15 square metres with a treated frame. All prices include materials, labour, waste removal and VAT. See the full price list.

Questions about fences & decks

Whose fence is it?

Usually the deeds say; often they do not. We will put the new fence on your side of the boundary and talk to the neighbour with you if it helps. Most of our fences are paid for half each.

Start with a visit.

Cerys comes to the garden, measures it and listens, for free. A sketch follows, then a plan, then one price. No pressure at any stage; some people build it three summers later.